Fire stopping in Welwyn Garden City

A planned town from the 1920s, with nearly a century of alterations inside it.

  • Every seal labelled and photographed
  • BM TRADA / FIRAS-certificated contractors
  • Written price before any work
Get a price

We reply with a written price.

We use these details to reply to you. See our privacy notice.

Welwyn Garden City was laid out from 1920 as one of the first garden cities, and much of its older housing is in the neo-Georgian style it is known for, with later blocks of flats, offices and the town centre around them. Nearly a century on, a lot of those buildings have been altered, extended or split into flats.

In the older blocks of flats, many of them three or four storeys with a shared stair and no lift, the fire stopping issues are usually at the stair and in the loft. The stair is the only way out, so its walls and ceiling need to be intact where cables and pipes pass into each flat. The loft should be divided on the line of the walls between flats, or have cavity barriers there. Aerial and solar installers going into the loft are a common cause of damage.

In the town centre, offices with flats above or offices turned into flats have the conversion problems: flat walls that stop at a suspended ceiling, new soil pipes cut through the floors, and cables under raised floors running between flats.

Welwyn Garden City is in Welwyn Hatfield borough, and the fire and rescue service is Hertfordshire Fire and Rescue Service. Our BM TRADA / FIRAS-certificated contractors cover the town from St Albans.

A steel conduit and a plastic pipe passing up through a rough hole beside a concrete slab
A steel conduit and a plastic pipe passing up through a rough hole beside a concrete slab
Fire risk assessment asking for fire stopping?

Send the postcode, the type of building and the line from the assessment, or a photo of the gap. We reply with what it needs and a written price.

Call 01727 222296Get a quote