Fire stopping installation
The right tested product in each hole, then a label and a photo.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
A plastic soil pipe through a concrete floor gets a steel collar lined with intumescent material, screwed to the underside of the slab. A copper pipe through blockwork gets mineral wool pushed into the gap and intumescent mastic over it, to the depth in the test. A cable tray through a riser wall gets a coated fire batt cut tight round the tray and the cables, with mastic on every edge. A gap along the top of a wall under the slab gets a linear seal that can move with the building.
Older work in St Albans buildings often falls down at exactly this point. We find expanding foam round cable bundles, sand and cement round plastic pipes, a thin skin of mastic over a deep gap, and collars tested in concrete fitted to timber floors. They look like fire stopping and none of them will hold.
The installation is carried out by our BM TRADA / FIRAS-certificated contractors. Old seals that will not hold are photographed and cut out. Each new seal gets a numbered label beside it and a photo once it is finished, and the schedule lists every one with its product and fire rating.

Send the postcode, the type of building and the line from the assessment, or a photo of the gap. We reply with what it needs and a written price.